P. Ghoddosi
Department of Civil Engineering, Iran Science and Technology University, Tehran, Iran
M. P. Jalal
Department of Civil Engineering, Iran Science and Technology University, Tehran, Iran
M. Hosseinalipour
Department of Urban and Architecture, Building Engineering and Management Section, Shahid Beheshti University, Tehran, Iran
PDF Fulltext XML References Citation
How to cite this article
P. Ghoddosi, M. P. Jalal and M. Hosseinalipour, 2008. Fuzzy Assessment of Causes of Time Overrun (Delays) in Iran`s Dam Construction Projects. Journal of Applied Sciences, 8: 3423-3430.
DOI: 10.3923/jas.2008.3423.3430
URL: https://scialert.net/abstract/?doi=jas.2008.3423.3430
DOI: 10.3923/jas.2008.3423.3430
URL: https://scialert.net/abstract/?doi=jas.2008.3423.3430