Fengzhang Luo
Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
Qiang Yin
Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
Chen Fang
Shanghai Municipal Electric Power Company, State Grid Corporation of China, Shanghai 200122, China
ABSTRACT
In view of balancing the electric power and energy and decreasing the transmission pressure of the urban central areas, a city clustered oriented distribution network planning method is put forward in this paper, based on the clustered city planning theory. Firstly, by analyzing the different function of clusters, both the load forecast and the location choice of substations take the differential orientation of clusters into account. Then, based on the planning principles of hierarchy, network is divided into several functional layers cooperatively connecting with each other to reach the combined operating mode. The scattered power substation and distribution lines are integrated and the network data and planning method with similar industrial function are collected. Finally, the standard for city clustered planning is established. The practical application in the distribution network of Livable Education City in the city of Zhengzhou shows that the proposed method will meet the demand of practical work in distribution network.
PDF References Citation
How to cite this article
Fengzhang Luo, Qiang Yin and Chen Fang, 2013. A City Clustered Oriented Power Distribution Network Planning Method and
its Application. Information Technology Journal, 12: 5962-5966.
DOI: 10.3923/itj.2013.5962.5966
URL: https://scialert.net/abstract/?doi=itj.2013.5962.5966
DOI: 10.3923/itj.2013.5962.5966
URL: https://scialert.net/abstract/?doi=itj.2013.5962.5966
REFERENCES
- Li, C.B. and J.Z. Liang, 2009. A novel method of power grid differential planning. Automat. Elect. Power Syst., 33: 11-15.
CrossRef - Li, X.H. and J.L. Zhang, 2008. Load forecasting and substation planning of Tianjin Binhai district. Distrib. Utilizat., 3: 18-20.
CrossRef - Liang, J.Z., Q. Xia and D.X. Wang, 2009. A new thinking of group based power grid planning for cities with rapid growth. Power Syst. Technol., 33: 70-75.
Direct Link - Kong, T., H.Z. Cheng, J.M. Wang, Y.N. Li and S.Y. Wang, 2009. United urban power grid planning for network structure and partition scheme based on bi-level multi-objective optimization with genetic algorithm. Proc. CSEE, 29: 59-65.
Direct Link - Wang, L. and Z.Q. Wu, 2006. Selection of regional coordination mode of coastal region in Zhongshan. City Plan. Rev., 30: 80-82.
CrossRef - Zhou, X., 2005. Adjustment of administrative division and perfection of planning management system with Foshan as an example. Planners, 7: 80-82.
CrossRefDirect Link