Liu Bo
School of Business, Hohai University, Nanjing, People Republic of China
Shen Ju-Qin
School of Business, Hohai University, Nanjing, People Republic of China
Tan Fei
School of Business, Hohai University, Nanjing, People Republic of China
Wang Da-Wei
School of Business, Hohai University, Nanjing, People Republic of China
Tang Liang
School of Business, Hohai University, Nanjing, People Republic of China
Xu Zi-Lin
School of Business, Hohai University, Nanjing, People Republic of China
ABSTRACT
The uncertain factors influencing the whole schedule of construction supply chain and the uncertain factors of the enterprises in influencing the schedule in each panel point are analyzed. Based on the analysis of influencing factors made by the ISM method, two aspects are generalized: The extent of the cooperation consciousness of the strategic partner (information sharing) and the handover of each professional process.
PDF References Citation
How to cite this article
Liu Bo, Shen Ju-Qin, Tan Fei, Wang Da-Wei, Tang Liang and Xu Zi-Lin, 2013. Study on the Influence Factor System of Engineering Project Schedule in Construction Supply Chain Model. Journal of Applied Sciences, 13: 4057-4061.
DOI: 10.3923/jas.2013.4057.4061
URL: https://scialert.net/abstract/?doi=jas.2013.4057.4061
DOI: 10.3923/jas.2013.4057.4061
URL: https://scialert.net/abstract/?doi=jas.2013.4057.4061
REFERENCES
- Duclos, L.K., R.J. Vokurka and R.R. Lummus, 2003. A conceptual model of supply chain flexibility. Ind. Manage. Data Syst., 103: 446-456.
CrossRef - Yeo, K.T. and J.H. Ning, 2002. Integrating supply chain and critical concepts in engineer-procure-construct (EPC) projects. Int. J. Project Manage., 20: 253-262.
CrossRef - Love, P.E.D., Z. Irani and D.J. Edwards, 2004. A seamless supply chain management model for construction. Supply Chain Manage.: Int. J., 9: 43-56.
CrossRefDirect Link - De Leeuw, A.C.J. and H.W. Volberda, 1996. On the concept of flexibility: A dual control perspective. Omega, 24: 121-139.
CrossRef - Milner, J.M. and P. Kouvelis, 2005. Order quantity and timing flexibility in supply chains: The role of Demand characteristics. Manage. Sci., 51: 970-985.
CrossRef - Tan, F. and B. Liu, 2008. Studies on integration and integrating mechanism of owner's organizing interface for large-scale construction projects. Construction Economy, 24: 70-74.
Direct Link - Voudouris, V.T. and A. Consulting, 1996. Mathematical programming techniques to debottlencek the supply chain of fine chemical industries. Comput. Chem. Eng., 20: S1269-S1274.
CrossRef