Yan-Jun Shi
School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, People�s Republic of China
Guo-Jiang Shen
School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, People�s Republic of China
Wang Chen
China North Vehicle Research Institute, Beijing 100072, People`s Republic of China
PDF Fulltext XML References Citation
How to cite this article
Yan-Jun Shi, Guo-Jiang Shen and Wang Chen, 2011. Solving Project Scheduling Problems using Estimation of Distribution Algorithm with Local Simplex Search. Information Technology Journal, 10: 1374-1380.
DOI: 10.3923/itj.2011.1374.1380
URL: https://scialert.net/abstract/?doi=itj.2011.1374.1380
DOI: 10.3923/itj.2011.1374.1380
URL: https://scialert.net/abstract/?doi=itj.2011.1374.1380