Wang Yuxia
Department of Information and Engineering, Wuhan University of Technology Huaxia College, Wuhan, Hubei, 430223, China
PDF References Citation
How to cite this article
Wang Yuxia, 2013. Schedule of a Resource-constraint Manufacturing System Based on GA. Information Technology Journal, 12: 5799-5805.
DOI: 10.3923/itj.2013.5799.5805
URL: https://scialert.net/abstract/?doi=itj.2013.5799.5805
DOI: 10.3923/itj.2013.5799.5805
URL: https://scialert.net/abstract/?doi=itj.2013.5799.5805