Ai-lin Zhang
Architectural and Civil Engineering Institute,Inner Mongolia Scientific and Technical University, Baotou Inner Mongolia 014010, China
Li-xia Wang
Construction Engineering Safety Supervision station of BaoTou, Baotou Inner Mongolia 014010, China
ABSTRACT
In this study, based on the actual needs of our country's engineering project schedule management, Dr. Goldratt's critical chain management theory is optimized and builds a critical chain schedule management model which can be widely used in the engineering practice.
PDF References Citation
How to cite this article
Ai-lin Zhang and Li-xia Wang, 2013. Application Research on the Critical Chain Technology in Engineering Project Schedule Management. Information Technology Journal, 12: 4196-4199.
DOI: 10.3923/itj.2013.4196.4199
URL: https://scialert.net/abstract/?doi=itj.2013.4196.4199
DOI: 10.3923/itj.2013.4196.4199
URL: https://scialert.net/abstract/?doi=itj.2013.4196.4199
REFERENCES
- Oskamp, S., 1965. Overconfidence in ca Oskamp se-study judgments. J. Consulting Psychol., 29: 261-265.
Direct Link - Tversky, A. and D. Kahneman, 1974. Judgment under uncertainty: Heuristics and biases. Science, 185: 1124-1131.
CrossRefDirect Link