Zhang He
School of Electronic and Information Engineering, Southwest Petroleum University, Chengdu, Sichuan 610500, China
Ma Xin
School of Electronic and Information Engineering, Southwest Petroleum University, Chengdu, Sichuan 610500, China
Deng Zhen
School of Electronic and Information Engineering, Southwest Petroleum University, Chengdu, Sichuan 610500, China
ABSTRACT
According to the problem of SAGD dual-horizontal wellbore anti-collision, by studying the characteristics of SAGD dual-horizontal well drilling process, this paper uses multi-source information fusion technology to carry out data fusion on parameters of multiple hole trajectory, establishes a mathematical model of spatial geometry, forms a set of real-time dynamic monitoring and early-warning technology of SAGD dual-horizontal well trajectory by using the new well trajectory spacing calculation method and achieves dynamic tracking and dynamic adjustment of the SAGD dual-horizontal well trajectory, finally ensures the effective implementation of SAGD dual-horizontal well drilling. Meanwhile, by using the remote transmission technology based on GPRS/CDMA, this paper achieves remote monitoring of the information between the well site and command center.
PDF References Citation
How to cite this article
Zhang He, Ma Xin and Deng Zhen, 2013. Research on Anti-collision Early-warning and Remote Centralized Monitoring
Technology of Sagd Dual-horizontal Wellbore. Information Technology Journal, 12: 5536-5540.
DOI: 10.3923/itj.2013.5536.5540
URL: https://scialert.net/abstract/?doi=itj.2013.5536.5540
DOI: 10.3923/itj.2013.5536.5540
URL: https://scialert.net/abstract/?doi=itj.2013.5536.5540
REFERENCES
- Chen, R.M., Y. Chen and W. Luo, 2011. Application of magnetic guidance techonlogy in SAGD double horizontal well and development. Xinjiang Oil Gas., 9: 25-37.
Direct Link - Diao, B.B., D.L. Gao and Z.Y. Wu, 2011. Magnet ranging calculation method of twin parallel horizontal wells steerable drilling. J. China Univ. Petroleum (Edn. Nat. Sci.), 35: 71-75.
Direct Link - Liu, Z., L. Cheng, Y. Ji and Q. Liu, 2011. Production features of steam and gas push: Comparative analysis with steam assisted gravity drainage. Petroleum Exploration Dev., 38: 79-83.
CrossRef - Zhang, W., Z. Lu and C. Wang, 2011. The drilling technology of connecting the SAGD parallel horizontal well and the straight well. China Petroleum Machinery, 39: 8-92.
Direct Link