Xiaoying Yang
School of Mechatronics Engineering, Henan University of Science and Technology, Henan Luoyang, 471003, China
Song, ming
School of Mechatronics Engineering, Henan University of Science and Technology, Henan Luoyang, 471003, China
Yang Yang
School of Mechatronics Engineering, Henan University of Science and Technology, Henan Luoyang, 471003, China
Huayue Sun
School of Mechatronics Engineering, Henan University of Science and Technology, Henan Luoyang, 471003, China
ABSTRACT
In order to overcome the problems in current literatures, that is neglect of collaborative effects and lean operation and the simple weighted method for dealing with the relations of quality, duration and cost, the collaborative optimization of planning and control for Large Equipment Service-oriented Manufacturing (LESM) is studied systematically based on lean logistics. Firstly, the necessity of collaborative optimization of planning and control were analyzed, as well as the lean logistics objective and the relationship among three objectives of quality, duration and cost. Secondly, introducing the Taguchi quality loss function and punishment factor, the coordination model of quality-duration-cost was established based on the cost. Thirdly, considering coordination among levels of project and quality-duration-cost, a multi-level and multi-objective coordination optimization model of planning and control was built. Fourthly, integration algorithm of simulation modeling and genetic algorithm (SM and GA) was designed and effectiveness was verified by case study. This provides a theoretical method for LESM planning and control.
PDF References Citation
How to cite this article
Xiaoying Yang, Song, ming, Yang Yang and Huayue Sun, 2013. Collaborative Optimization of Planning and Control for Large Equipment Service-oriented Manufacturing Based on Lean Logistics. Information Technology Journal, 12: 8249-8255.
DOI: 10.3923/itj.2013.8249.8255
URL: https://scialert.net/abstract/?doi=itj.2013.8249.8255
DOI: 10.3923/itj.2013.8249.8255
URL: https://scialert.net/abstract/?doi=itj.2013.8249.8255
REFERENCES
- Dan, H.F., J.W. Zhang and N.D. Yang, 2011. Resource constrained tradeoff optimization of time-cost-quality. Comput. Simul., 28: 254-258.
Direct Link - Kim, Y., C. Yun, S.B. Park, S. Park and L.T. Fan, 2008. An integrated model of supply network and production planning for multiple fuel products of multi-site refineries. Comput. Chem. Eng., 32: 2529-2535.
CrossRefDirect Link - Li, H.T. and K. Womer, 2012. Optimizing the supply chain configuration for make-to-order manufacturing. Eur. J. Oper. Res., 221: 118-128.
CrossRef - Li, Y.H., Z.W. Wang and Y. Pang, 2008. Proportional optimization of time, quality and cost under resource restriction. J. Central South Univ. For. Technol., 28: 101-105.
Direct Link - Luo, C.P. and G. Rong, 2009. A strategy for the integration of production planning and scheduling in refineries under uncertainty. Chin. J. Chem. Eng., 17: 113-127.
CrossRef - Maravelias, C.T. and C. Sung, 2009. Integration of production planning and scheduling: Overview, challenges and opportunities. Comput. Chem. Eng., 33: 1919-1930.
CrossRef - Al-e-Hashem, S.M.J.M., H. Malekly and M.B. Aryanezhad, 2011. A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty. Int. J. Prod. Econ., 134: 28-42.
CrossRef - Mohammadjafari, M., S. Ahmed, S.Z.M. Dawal and H. Zayandehroodi, 2011. Reducing time and cost of new product development in SMEs by E-collaboration through project management approach. Adv. Sci. Lett., 4: 2513-2516.
CrossRef - Peng, W.L. and C.E. Wang, 2010. Critical chain method project scheduling based model and its GA solution. J. Syst. Eng., 25: 123-131.
Direct Link - Qiao, L.H., S. Kao and C. Wang, 2011. Process modeling and simulation for multi-level network project planning. J. Mech. Eng., 47: 152-163.
Direct Link - Shah, N.K. and M.G. Ierapetritou, 2012. Integrated production planning and scheduling optimization of multisite, multiproduct process industry. Comput. Chem. Eng., 37: 214-226.
CrossRef - Wang, Y.J. and Y.K. Li, 2010. A planning model of large complex construction projects based on system dynamics. Ind. Eng. Manage., 3: 87-94.
Direct Link - Wang, Z.F., J.Y. Ding, Y. Liu and X. Liu, 2012. Analysis of critical path and most critical activity in PERT networks based on Monte Carlo method. J. Syst. Eng. Electron., 34: 1646-1651.
Direct Link - Zhang, G.Q., J. Shang and W.L. Li, 2011. Collaborative production planning of supply chain under price and demand uncertainty. Eur. J. Oper. Res., 215: 590-603.
CrossRef - Zhang, J.W., Y. Xu and Z.W. He, 2009. Duration/cost trade-offs in project scheduling with time-switch constraints under multi-cost. Oper. Res. Manage. Sci., 18: 78-84.
Direct Link - Zhang, M.H., A.P. Li and L.Y. Xu, 2012. Multi-enterprise collaborative production planning and scheduling optimization based on Pareto optimality. Chin. Mech. Eng., 23: 563-569.
Direct Link - Zhang, S.Q., X.D. Chen, Q.X. Chen and X. Chen, 2011. Summary and survey of production projects scheduling under uncertainty. Comput. Appl. Res., 28: 809-813.
Direct Link - Modigliani, F. and F.E. Hohn, 1955. Production planning over time and the nature of the expectation and planning horizon. Econometrica, 23: 46-66.
Direct Link